Office moving
- Everything will be fast, easy and with no stress. You call our manager and get a consultation on the details of your move.
- The most challeging task for movers is to ensure that your stuff will be able to work without interruption. Servers and telephone stations (if such is) will be unpluged right before you leave the office, that allows you to have an access to communication and information channels till the very last moment.
- The accurate plan and precise calculations will let you move fast and on the low budget. The plan of your stuff location (at the new place), as well as the list of works to be performed will be listed by us and coordinated with you.
- All the necessary works, such as , dismounting, packing and labeling the furniture, personal belongings, office equipment, interior objects and documents. A
Move without losing clients
In the time most convenient for you, our manager arrives at your Office to provides you a price quote, based on a thorough onsite calculations, measurements and extra services requested by you. Konwing the price before the move allows you to plan your expenses and include them on the budget. Our main task is to ensure that your company won't be forced to interrupt its work during the move.
Getting prepared to move
In order to get prepared, you need to be ready to spend some time to plan the move. But it will be completely on us. We will plan your move by a MOVE PLANNER (checklist). It will let us reduce the time spent on the move and, as a consequence, significally cut the client’s moving expences.
The plan of your stuff location (working place), as well as the list of works to be performed will be set by us and coordinated with you.
Move out
On the move date, at the time appointed, the movers arrive. In case of necessity, before the move starts, all the floors, walls, door-frames and lifts are covered with protective coating. It will protect your property against possible scratches and damages.
In the organized priority, s getting prepared, the loading starts.
Everything is ready for moving to a new location.
Move in
All the possessions are relocated. Movers set about to unpack the borne as well as the furniture mounting. According to the preliminary drawn up floor plan, all the furniture, office equipment, interior objects are set on their places. The order and accuracy are extremely important at this point.
In order to let your office start working at the same day as move, first of all your key workers will be provided with telephones and opportunity to get connected to a local network. Then the works on office equipping will be carried out: the furniture will be fixed up and disposed, the equipment will be unpacked and got ready to wire up, documents will be set in order. On the final stage, all the used up packing material will be taken away.
Moved
You overhaul all the moved items and sign in the bill of lading. It would be greatly appreciated, if you leave your response on the move, share you impress and mood, give us your proposals, in order to help us to improve our service. You can use a blank, proposed by moving team master.
The next day
Through experience we know that after the move, some odds and ends may appear, such as some of your employers will decide to turn the tables, someone will be disturbed by the sun shining too brightly and the blinds will need to be hung, or the necessity to hang the screen in the conference room will appear. At this point we also might be useful.